Up end connection to the locomotive depotMarch 25, 2023 |
||
Looking back to the signals for up trains departing GeelongMarch 25, 2023 |
'Limit of Shunt' board at the down end of locomotive depotMarch 25, 2023 |
|
Signal and catchpoint for the north end of the locomotive depotJanuary 27, 2019 |
Looking out over the tracks from Pako Raw cafeJuly 24, 2018 |
|
Looking out over the tracks from Pako Raw cafeJuly 24, 2018 |
Stabling sidings beside the main lineJuly 24, 2018 |
|
Pointwork at the up end of the sidingsJuly 24, 2018 |
South end of the VLocity train fuel pointApril 8, 2018 |
|
One of four fuelling pointsJuly 5, 2009 |
Refuelling stations under the roofJuly 5, 2009 |