TPWS fitted signal NSP162 for down trainsJanuary 20, 2019 |
TPWS and axle counters fitted to signal NSP162January 20, 2019 |
Reinforced steelwork on the overhead stanchionsJanuary 20, 2019 |
Axle counters overlay for the Champion Road level crossingJanuary 20, 2019 |
Signals NSP166 and TPWS fitted NSP164 for down trainsJanuary 20, 2019 |
Down end lead into Newport Workshops stabling sidingsJanuary 20, 2019 |
TPWS installed at signal G456 at Newport SouthJanuary 18, 2014 |
Single check rail for the East Line at Newport SouthJanuary 18, 2014 |
|
Concrete sleepers in siding 'E' at Newport SouthJanuary 18, 2014 |
||
Newport SouthLooking away from Newport. Siding to the left, two main lines in the middle, goods line branching off on the right, standard gauge to the extreme right March 11, 2007 |