Recent Uploads

Displaying images 1 to 18

Left hand turnout awaiting installation at the up end of Caroline Springs station

Presumably it will form a crossover from the down to up track for trains exiting the Boral quarry siding, in conjunction with the existing left hand turnout at the end of the single track.

In album: Caroline Springs

November 26, 2016
Viewed 1 time

Left hand turnout awaiting installation at the up end of Caroline Springs station

Presumably it will form a crossover from the down to up track for trains exiting the Boral quarry siding, in conjunction with the existing left hand turnout at the end of the single track.

In album: Caroline Springs

November 26, 2016
Viewed 1 time

Looking east at the reopened Avenue Road level crossing at Burrumbeet

The level crossing was closed back in the 1990s with the opening of the Ballarat Bypass, then reopened in 2015 to allow the Avenue of Honour to continue north as a continuous road.

In album: Burrumbeet

July 23, 2016