| Rail Geelong » Gallery » Recent updates | Recent updates :: Search |
Recent uploads, photos 1 to 24 shown on this page
| Next » |
Siding slewed for more clearance from the main line |
New signal post 5 |
Annett lock points for the southern siding |
Siding slewed for more clearance from the main line |
Siding slewed for more clearance from the main line |
Work on altering the siding track to the new points |
Old points before removal |
Old points removed and straight railed |
New signal post for down end |
Old Annett locked points to be removed |
New points and signal in place |
New track panels to replace old set of points |
New signal post and points to permit platform extension |
Deck no nowhere, acess to future platform 15/16 |
Future platform 15/16 |
New pedestrian gates provided at Yarra Street |
Work on the extension of platform 5/6 to permit 7 car Vlocity consists |
Escalators in place and roof supports underway |
D621_2128 |
New passenger shelters in place |
Up top of the new concourse |
Up top of the new concourse, lift wells evident |
Work on the extension of platform 5/6 to permit 7 car Vlocity consists |
Work on the extension of platform 5/6 for 7 car Vlocity consists |
| Next » |