Geelong Line Home :: Track Diagram (1) :: (2) :: Safeworking Diagram :: Events :: Locations

Safeworking diagram - 2009

Displays both the number of tracks and the safeworking system in use for a given year. Pre 1900 details are rather fuzzy. From South Geelong down the line the majority of details are fuzzy as well.

1856 1857 1876 1911 1914 1928 1959 1970 1981 Reset View
3.492 South Kensington
10.555 Newport
Newport South
13.281 Altona Junction
20.917 Laverton
31.697 Werribee
47.561 Little River
57.504 Lara
63.944 Corio
68.430 North Geelong Junction
69.950 North Geelong Junction
72.567 Geelong
74.412 South Geelong
79.600 Marshall
113.740 Winchelsea
153.395 Colac
198.497 Camperdown
220.785 Terang
267.301 Warrnambool

Legend


Staff and Ticket Automatic & Track Control Double Line Block
Large Electric Staff Centralised Train Control Track Block
Miniature Electric Staff Section Authority Working Yard Limits
Composite Electric Staff Train Order Working Tablet Working
What do they mean?

Sources


  • The majority of opening and safeworking dates are via Andrew Waugh.
  • Additional sources used are listed in the Sources section.