Altona Junction

Junction
Line: Melbourne - Geelong - Warrnambool
Junction with: Altona Line
Distance from Melbourne: 13.281 km
Track Diagram: View
Google Maps: Satellite /  Map
Opened: Sunday, 22 October 1967

The initial junction of the Geelong line with the Williamstown Racecourse / Altona line was at Newport South, with the two separate lines running parallel until they diverged a kilometre to the west.

This was altered in 1967 when the line between Newport South and Rock crossing loop was duplicated. The junction was moved to the point of divergence, and named Altona Junction. It was initially worked from a signal panel at Newport South until that signal box's closure, when control was transferred to Newport. In 1985 the loop on the Altona line was lengthened, and bidirectional signalling provided on each leg.

At the down end of the junction heading for Geelong there is a crossover between the two tracks, facing down trains on the East line or up trains on the West line. By the mid 2000s the crossover was little used, deteriorating in condition until a 50 km/h speed restriction was placed onto it. These restrictions lasted a number of months at a time until bandaid fixes were made, as the suburban rail operator was not affected by them. The last speed restriction was put into place in 2009, the crossover being removed over the weekend of May 15, 2010.

Events


Sunday, 22 October 1967 Opened
Line Opened
Thursday, 25 June 1857 Line officially opened between Geelong and at temporary terminus at Greenwich. A ferry was used the complete the journey to Melbourne
Saturday, 3 October 1857 Temporary Greenwich terminal and stub line closed. Geelong line now connected to the partially completed Williamstown line. A ferry complete the journey from Williamstown to Melbourne
Monday, 17 January 1859 Williamstown line finally completed to Melbourne. Geelong trains can now operate direct to Spencer Street Station
Tuesday, 7 April 1885 Line opened Newport South to Williamstown Racecourse
Track Amplified
Sunday, 22 October 1967 Line duplicated Altona Junction to Laverton
Sunday, 22 October 1967 Line duplicated Newport South - Altona Junction
Safeworking
Sunday, 22 October 1967 Line duplicated Newport South - Altona Junction
Sunday, 22 October 1967 Rock closed. Automatic and Track Control section now Altona Junction - Laverton
(Sunday, 20 January 1985) Westona opened. Automatic and Track Control section now Altona Junction - Westona

Top

Photos


9 images found. Click them to enlarge.

Altona Junction looking down

Altona Junction looking down

Looking down the line from Maddox Road

Looking down the line from Maddox Road

Substation at Altona Junction

Substation at Altona Junction

Looking towards Melbourne

Looking towards Melbourne

Looking towards Paisely

Looking towards Paisely

Looking towards Paisely

Looking towards Paisely

And one of the up end

And one of the up end

Another view of the substation for good measure

Another view of the substation for good measure

Relay room and speed restriction on the track towards Paisley

Relay room and speed restriction on the track towards Paisley

Top