Corio Signal Box
In 1914 Corio was interlocked with a 30 lever frame housed in a signal bay.
A 6 lever panel was provided in 1967 to control the up end of a new connection to the Phosphate Sidings at North Shore.
In 1981 in conjunction with the duplication of the line the existing frame and panel were replaced with a single new panel with switch out facilities.
Remote control from North Geelong A was provided in 2001 with a Westcad terminal. This terminal was relocated to the Geelong Signal Control Centre in 2005 in conjunction with the Regional Fast Rail resignalling of the Geelong line.
Events
Line Opened
| Saturday, 1 November 1856 | Line opened Lara to Geelong |
| Thursday, 25 June 1857 | Line officially opened between Geelong and at temporary terminus at Greenwich. A ferry was used the complete the journey to Melbourne |
| Saturday, 3 October 1857 | Temporary Greenwich terminal and stub line closed. Geelong line now connected to the partially completed Williamstown line. A ferry complete the journey from Williamstown to Melbourne |
| Monday, 17 January 1859 | Williamstown line finally completed to Melbourne. Geelong trains can now operate direct to Spencer Street Station |
Track Amplified
| Sunday, 8 February 1959 | Line duplicated Corio to North Geelong A |