| « International Harvester | Harbour Trust Sidings » |
Cowies Creek
The twin broad gauge lines cross on a bridge with bluestone abutments. A second bridge was built to the west in 1995 for the standard gauge line. A third bridge was built in 2008 for the Corio Independent Goods Line, and is much longer than the others as it was built with abutments much further back from the creek edge.