Excavation underway on the north side of the railway for the future road underpass

Excavation underway on the north side of the railway for the future road underpass
View full size photo (1920px by 1280px)

Taken with a Canon EOS 7D
Date: November 20, 2021 10:52 AM
Exposure Time: 1/2000 sec
Aperture Value: f/7.1
Focal Length: 24 mm