2008 Metwest Southern Cross Station resignalling

Over the Queens Birthday long weekend from 6 - 9 June 2008 the connection between Southern Cross Station and the suburban tracks was reconfigured and resignalled. New dual gauge trackwork was installed to platform 2, along with dual runaround tracks, a standard gauge motorail dock, and the replacement of the mechanical interlocking at Spencer Street No.1 signal box with a new Solid State Interlocking.

Motorail dock completed

September 26, 2008

Motorail dock completed

September 26, 2008

Motorail dock concrete done

September 16, 2008

Motorail dock concrete done

September 16, 2008

Work on the motorail dock

September 10, 2008

Work on the motorail dock

September 10, 2008