Main line connection now completely removedJanuary 20, 2019 |
Removed rail dumped, looking back to main lineJanuary 18, 2009 |
Removed rail dumped, looking back to main lineJanuary 18, 2009 |
Culvert for the sidingJanuary 18, 2009 |
Looking up the line to the pointsJanuary 18, 2009 |
Signal hut and electrical cabinetJanuary 18, 2009 |
Signal equipment at the former mainline connectionFrom left to right - switch lever to operate points, white pillar is the switch lock to obtain release from signaller to unlock points, and red and green point indicator to the right. Small white box is a point detector. Standard gauge line visible in background March 11, 2007 |
Main line connectionSpiked points for the now removed siding. Switch lock, switch lever and point indicator to the right. Standard gauge line visible in background March 11, 2007 |