Camperdown

For more details see Camperdown.
Trio of new signal masts waiting to be installed

Trio of new signal masts waiting to be installed

April 22, 2022
Former way and works campsite at the down end of the station yard

Former way and works campsite at the down end of the station yard

April 22, 2022
Signal 6 cleared at Camperdown for an up train to arrive into the platform

Signal 6 cleared at Camperdown for an up train to arrive into the platform

April 22, 2022
Signalling upgrades at the down end of the yard

Signalling upgrades at the down end of the yard

April 22, 2022
Incorrect 'Trains replaced by road coaches' message on the LED screen

Incorrect 'Trains replaced by road coaches' message on the LED screen

April 21, 2022
Upgraded public toilets in the waiting room

Upgraded public toilets in the waiting room

April 21, 2022
Fancy pants water filter and drinking fountain in the waiting room

Fancy pants water filter and drinking fountain in the waiting room

April 21, 2022
Trail map for the Camperdown-Timboon Rail Trail

Trail map for the Camperdown-Timboon Rail Trail

April 21, 2022
Boom barriers at the Sandys Lane, Gnotuk level crossing

Boom barriers at the Sandys Lane, Gnotuk level crossing

April 21, 2022
Up side of the Sandys Lane, Gnotuk level crossing

Up side of the Sandys Lane, Gnotuk level crossing

April 21, 2022
205 km post at the down end of the Sandys Lane, Gnotuk level crossing

205 km post at the down end of the Sandys Lane, Gnotuk level crossing

April 21, 2022
Boom barriers at the Sandys Lane, Gnotuk level crossing

Boom barriers at the Sandys Lane, Gnotuk level crossing

April 21, 2022
Signalling upgrade works at the up end of the yard at Camperdown

Signalling upgrade works at the up end of the yard at Camperdown

April 21, 2022
Axle counters waiting to be installed at the up end of the yard at Camperdown

Axle counters waiting to be installed at the up end of the yard at Camperdown

April 21, 2022
TPWS grid installed at the down end of the yard at Camperdown

TPWS grid installed at the down end of the yard at Camperdown

April 21, 2022
Signalling upgrade works at the down end of the yard at Camperdown

Signalling upgrade works at the down end of the yard at Camperdown

April 21, 2022
Church Street level crossing

Church Street level crossing

May 17, 2017
Nonsensical arrangement of movable pedestrian gates at the Church Street level crossing

Nonsensical arrangement of movable pedestrian gates at the Church Street level crossing

May 17, 2017
  • « Previous
  • 1
  • 2
  • Next »
  • Home
  • News
  • Updates
  • Line Guides
  • Geelong Region
  • Melbourne Region
  • South West Victoria
  • Locations
  • Stations
  • Industries
  • Signal Boxes
  • Yards
  • Miscellaneous
  • Articles
  • Aerial View
  • Gallery
  • Recent uploads
  • Contact
  • Credits
  • Sources
  • Sitemap
Home :: Sitemap :: Copyright :: Contact
Page Generation: 0.058 seconds.
Copyright 2005 - 2023 © Marcus Wong except where otherwise noted.