Wall of containers follow the Qube siding at Altona NorthNovember 30, 2021 |
Signals 15/12 for the siding and 15/10 for up trains on the mainlineNovember 1, 2021 |
CRT sidings rejoin the main lineNovember 1, 2021 |
Concrete hardstand poured on the eastern side of the existing sidingsSeptember 4, 2021 |
||
Rusty tracks leading into the sidingJanuary 20, 2019 |
Signals 15/12 and 15/10 for up trainsJanuary 20, 2019 |
|
Yet to be commissioned signalling for down trains at the sidingOctober 1, 2011 |
South end of the sidingsJanuary 25, 2009 |
|
Three loading sidings looking back to main lineJanuary 18, 2009 |
Road hauled freight and stored wagonsJanuary 18, 2009 |
Switchlock for main line pointsJanuary 18, 2009 |
Point indicator and switchlockJanuary 18, 2009 |
Dead end stub and main line points looking upJanuary 18, 2009 |
Main line points and dead end runoff stubJanuary 18, 2009 |