|
|
|
|
LX controls for Forest Road on the left. The switchlock is used to get permission from the signaller, so the points can be unlocked and operated
July 28, 2007
|
|
From left to right: point lever, point indicator, box holding point clips, level crossing control keyswitch and switchlock. Foreground track is the SG, other two are BG
July 28, 2007
|
|
|
|
|
|
|
|
|