East line down direction signalSeptember 28, 2006 |
Overview of the North Shore station platformsSeptember 28, 2006 |
Looking down the North Shore station platformSeptember 28, 2006 |
Switch locked sidingFrom left to right: level crossing control, switch lock enclosure, point lever and point indicator July 14, 2006 |
Switch locked sidingJuly 14, 2006 |
Overview of North Shore from the northJuly 14, 2006 |
Up end signalsJuly 14, 2006 |
- « Previous
- 1
- 2
- 3
- 4
- Next »