Rail Geelong

Rail Geelong - hopefully everything you ever wanted to know about the history of the railways of Geelong and District, and then some.
Home » Gallery » Geelong Line » Waurn Ponds cement works
fields

Waurn Ponds cement works

<p>Photos of the rail served cement works at Waurn Ponds</p>. For more details see Waurn Ponds cement siding.
Siding at the down end of the cement works sidings has been rebranded for Boral

Siding at the down end of the cement works sidings has been rebranded for Boral

November 23, 2019
Down end of the cement works sidings

Down end of the cement works sidings

November 23, 2019
Three equipment cabinets at the Reservoir Road level crossing

Three equipment cabinets at the Reservoir Road level crossing

March 11, 2018
Boom gates at the Reservoir Road level crossing

Boom gates at the Reservoir Road level crossing

March 11, 2018
Looking east towards the cement plant

Looking east towards the cement plant

March 11, 2018
Signal WPD28 for up trains approaching Waurn Ponds

Signal WPD28 for up trains approaching Waurn Ponds

March 11, 2018
Future site of the Waurn Ponds stabling yard, west of the Reservoir Road level crossing

Future site of the Waurn Ponds stabling yard, west of the Reservoir Road level crossing

March 11, 2018
Future site of the Waurn Ponds stabling yard, west of the Reservoir Road level crossing

Future site of the Waurn Ponds stabling yard, west of the Reservoir Road level crossing

March 11, 2018
Signal WPD28 for up trains approaching Waurn Ponds

Signal WPD28 for up trains approaching Waurn Ponds

March 11, 2018
Boom gates at the Reservoir Road level crossing

Boom gates at the Reservoir Road level crossing

March 11, 2018
No entry sign at the Anglesea Road level crossing, looking down the line to the cement works

No entry sign at the Anglesea Road level crossing, looking down the line to the cement works

July 6, 2010
Automatic signal at Reservoir Road at stop, to prevent the flashing lights from operating during shunting movements

Automatic signal at Reservoir Road at stop, to prevent the flashing lights from operating during shunting movements

July 6, 2010
 Train Staff - Annett Key exchange unit

Train Staff - Annett Key exchange unit

July 6, 2010
Train Staff - Annett Key exchange unit

Train Staff - Annett Key exchange unit

July 6, 2010
Train Staff - Annett Key exchange unit

Train Staff - Annett Key exchange unit

July 6, 2010
Western face of the cement works

Western face of the cement works

January 23, 2010
Closeup of the new underpass, 8.5 metres clearance

Closeup of the new underpass, 8.5 metres clearance

January 23, 2010
New underpass of the railway for quarry trucks

New underpass of the railway for quarry trucks

January 23, 2010
  • « Previous
  • 1
  • 2
  • Next »
  • Home
  • News
  • Updates
  • Line Guides
  • Geelong Region
  • Melbourne Region
  • South West Victoria
  • Locations
  • Stations
  • Industries
  • Signal Boxes
  • Yards
  • Miscellaneous
  • Articles
  • Aerial View
  • Gallery
  • Recent uploads
  • Contact
  • Credits
  • Sources
  • Sitemap
Home :: Sitemap :: Copyright :: Contact
Page Generation: 0.064 seconds.
Copyright 2005 - 2020 © Marcus Wong except where otherwise noted.