|
|
|
|
|
|
|
The signal goes to red when the down end points are set for the siding, preventing the level crossing from operating when shunting is going on. A key switch allows the signal to be overridden if the shunt needs to carry on further down the line
May 3, 2007
|
|
|
|
|
|
|
|
|
|
|