Westvic Siding

Westvic Container Handling operates an intermodal terminal at the end of the Warrnambool line. For more details see Westvic Siding.

Looking past the end of the line at Westvic

The tracks across the Rooneys Road level crossing have been removed, track baulks at the down end of the container terminal

May 17, 2017

End of the line at Westvic

Rooneys Road level crossing

October 17, 2008