Rail Geelong

Rail Geelong - hopefully everything you ever wanted to know about the history of the railways of Geelong and District, and then some.
Home » Gallery » Geelong Line » Winchelsea
fields

Winchelsea

For more details see Winchelsea.
Partial replacement concrete sleepers in number 3 road - leftover from projects elsewhere?

Partial replacement concrete sleepers in number 3 road - leftover from projects elsewhere?

June 19, 2008
Concrete slab remains of something in the goods yard

Concrete slab remains of something in the goods yard

June 19, 2008
Station building viewed from the other side of the goods yard

Station building viewed from the other side of the goods yard

June 19, 2008
Down end of the station yard

Down end of the station yard

June 19, 2008
Western side of the station building

Western side of the station building

June 19, 2008
Loading platform in number 3 road

Loading platform in number 3 road

June 19, 2008
Overview of under the station verandah

Overview of under the station verandah

June 19, 2008
Myki gear and levers for the home signal

Myki gear and levers for the home signal

Originally Myki was going to be rolled out to the entire V/Line network, with civil works done at stations. But there was a change of government in 2010 and incoming premier Ted Baillieu decided to cut the scope of the V/Line rollout to just the commuter belt around Melbourne.

June 19, 2008
Historical trail marker at the station

Historical trail marker at the station

June 19, 2008
Back side of station building

Back side of station building

June 19, 2008
Station viewed from the down end

Station viewed from the down end

June 19, 2008
New track panels stacked at Cressy Road

New track panels stacked at Cressy Road

June 19, 2008
Down departure signal at Cressy Road

Down departure signal at Cressy Road

June 19, 2008
Key switch override for level crossing and signals at the down end

Key switch override for level crossing and signals at the down end

June 19, 2008
WSA hand throw lever and plunger locked control of points at the down end

WSA hand throw lever and plunger locked control of points at the down end

June 19, 2008
WSA hand throw lever and plunger locked control of points at the down end

WSA hand throw lever and plunger locked control of points at the down end

June 19, 2008
Point clip on the loop siding

Point clip on the loop siding

June 19, 2008
Down end points at Cressy Road

Down end points at Cressy Road

June 19, 2008
  • « Previous
  • 1
  • 2
  • 3
  • Next »
  • Home
  • News
  • Updates
  • Line Guides
  • Geelong Region
  • Melbourne Region
  • South West Victoria
  • Locations
  • Stations
  • Industries
  • Signal Boxes
  • Yards
  • Miscellaneous
  • Articles
  • Aerial View
  • Gallery
  • Recent uploads
  • Contact
  • Credits
  • Sources
  • Sitemap
Home :: Sitemap :: Copyright :: Contact
Page Generation: 0.081 seconds.
Copyright 2005 - 2022 © Marcus Wong except where otherwise noted.