Modern grain bunkers beside the old silosJanuary 9, 2022 |
Glenelg Highway level crossingJanuary 9, 2022 |
Modern grain bunkers beside the old silosJanuary 9, 2022 |
Westmere now a CTC signalled crossing loopJanuary 9, 2022 |
Looking down the line from the Glenelg Highway level crossingJanuary 9, 2022 |
Solar powered signal GV2158 for up trains approaching the sidingJanuary 8, 2009 |
Solar powered signal GV2158 for up trains approaching the sidingJanuary 8, 2009 |
Grain siloJanuary 8, 2009 |
Overview from the up endJanuary 8, 2009 |
Station building and location boardJanuary 8, 2009 |
Down end of sidingJanuary 8, 2009 |
Station building and platform from the yardJanuary 8, 2009 |
Booking window end of station buildingJanuary 8, 2009 |
Grain shed at the down endJanuary 8, 2009 |
Rail side of station buildingJanuary 8, 2009 |
Up end of the stationJanuary 8, 2009 |
Discharge chutes of the siloJanuary 8, 2009 |
Back of the station buildingJanuary 8, 2009 |