Construction of the new passing loop and second platform underway at Ballan station

Construction of the new passing loop and second platform underway at Ballan station
View full size photo (1920px by 1280px)

Taken with a Canon EOS 7D
Date: July 18, 2018 12:29 PM
Exposure Time: 1/640 sec
Aperture Value: f/10
Focal Length: 73 mm