Up the line from Llandeilo Lane level crossingThe curve was eased during the Regional Fast Rail project November 9, 2019 |
Down the line from the Llandeilo Lane level crossingThe curve was eased during the Regional Fast Rail project November 9, 2019 |
Railway passes Bostock ReservoirNovember 9, 2019 |
Bridge over the Bostock Reservoir western headwatersNovember 9, 2019 |
Bridge over the Bostock Reservoir eastern headwatersNovember 9, 2019 |
|
Double track from Ballan ends at Geelong-Ballan RoadNovember 9, 2019 |
Geelong-Ballan Road still single tracked for nowNovember 9, 2019 |
|
Geelong-Ballan Road still single tracked for nowNovember 9, 2019 |
Entrance to the new second platformSeptember 21, 2019 |
Car park on the town side of the stationMay 7, 2019 |
Bike locked up outside the stationMay 7, 2019 |
New footbridge and second platform in placeMay 7, 2019 |
|