Track connection in place for the future up track at the city end of Caroline Springs

The crossover is required so that up trains from the Boral quarry siding will still be able to use the main line
Track connection in place for the future up track at the city end of Caroline Springs
View full size photo (1920px by 1280px)

Taken with a Canon EOS 7D
Date: January 01, 2017 13:56 PM
Exposure Time: 1/320 sec
Aperture Value: f/10
Focal Length: 32 mm