Point blades waiting installation at the down end of the double track at Kerrs Road, Maddingley

Point blades waiting installation at the down end of the double track at Kerrs Road, Maddingley
View full size photo (1920px by 1280px)

Taken with a Canon EOS 7D
Date: July 30, 2019 12:29 PM
Exposure Time: 1/640 sec
Aperture Value: f/10
Focal Length: 70 mm