Melton

Removing a signal mast at the down end of Melton

Removing a signal mast at the down end of Melton

It was blocking the alignment of the future second track

November 9, 2019
Catch point and dwarf signal on the down end siding at Melton

Catch point and dwarf signal on the down end siding at Melton

September 21, 2019
Level crossing at Coburns Road now double track

Level crossing at Coburns Road now double track

July 30, 2019
Future down end of the double track, just before the Melton Weir bridge

Future down end of the double track, just before the Melton Weir bridge

July 30, 2019
Level crossing at Coburns Road now double track

Level crossing at Coburns Road now double track

July 30, 2019
Second track in place at Coburns Road, but not yet tied into the existing loop

Second track in place at Coburns Road, but not yet tied into the existing loop

July 30, 2019
Double track pedestrian crossing at Coburns Road

Double track pedestrian crossing at Coburns Road

July 30, 2019
Up end of the loop at Melton, yet to be tied into the new track

Up end of the loop at Melton, yet to be tied into the new track

July 30, 2019
Up end of Melton staiton

Up end of Melton staiton

July 30, 2019
Flooded paddocks beside the new track at Cobblebank

Flooded paddocks beside the new track at Cobblebank

June 18, 2019
Platform edge at Melton platform 2 shaved away for clearances

Platform edge at Melton platform 2 shaved away for clearances

June 18, 2019
Stockpile of concrete sleepers and ballast at the down end

Stockpile of concrete sleepers and ballast at the down end

June 18, 2019
Excavation work at the Coburns Road level crossing

Excavation work at the Coburns Road level crossing

June 18, 2019
Vacuum excavation at the down end of Melton

Vacuum excavation at the down end of Melton

June 18, 2019
Platform edge at Melton platform 2 shaved away for clearances

Platform edge at Melton platform 2 shaved away for clearances

June 18, 2019
Second track in place over Toolern Creek

Second track in place over Toolern Creek

May 7, 2019
Second track in place at the down end of Melton

Second track in place at the down end of Melton

May 7, 2019
Second bridge completed over Toolern Creek

Second bridge completed over Toolern Creek

February 16, 2019
  • « Previous
  • 1
  • 2
  • 3
  • 4
  • Next »
  • Home
  • News
  • Updates
  • Line Guides
  • Geelong Region
  • Melbourne Region
  • South West Victoria
  • Locations
  • Stations
  • Industries
  • Signal Boxes
  • Yards
  • Miscellaneous
  • Articles
  • Aerial View
  • Gallery
  • Recent uploads
  • Contact
  • Credits
  • Sources
  • Sitemap
Home :: Sitemap :: Copyright :: Contact
Page Generation: 0.025 seconds.
Copyright 2005 - 2023 © Marcus Wong except where otherwise noted.