Millbrook Loop
A new crossing loop being built in 2019 on the south track of the Bungaree Deviation, allowing the closure of the north track on the 'old' route via Wallace and Bungaree.
|
|
|
|
|
Originally installed when the line was single track - it will be removed when the second track is commissioned, replaced by signals elsewhere
November 9, 2019
|
|
|
|
|
|
|
|
|
|
|