Rail Geelong

Rail Geelong - hopefully everything you ever wanted to know about the history of the railways of Geelong and District, and then some.
Home » Gallery » Melbourne - Ballarat Line » Rockbank
fields

Rockbank

Car park on the northern side of the station

Car park on the northern side of the station

November 27, 2019
Steps down from the footbridge

Steps down from the footbridge

November 27, 2019
Station building on the southern side of the tracks

Station building on the southern side of the tracks

November 27, 2019
Massive new footbridge crosses the tracks

Massive new footbridge crosses the tracks

November 27, 2019
Ramp at the south end of the footbridge

Ramp at the south end of the footbridge

November 27, 2019
Lift, ramp and stairs at the north end of the footbridge

Lift, ramp and stairs at the north end of the footbridge

November 27, 2019
Lift, ramp and stairs at the south end of the footbridge

Lift, ramp and stairs at the south end of the footbridge

November 27, 2019
Double track at the down end of the new station

Double track at the down end of the new station

November 27, 2019
Double track at the up end of the new station

Double track at the up end of the new station

November 27, 2019
Down end of the new station

Down end of the new station

November 27, 2019
Applying the finishing touches to the new station

Applying the finishing touches to the new station

November 27, 2019
Pedestrian gates in place at Hopkins Road but no pedestrian crossing yet

Pedestrian gates in place at Hopkins Road but no pedestrian crossing yet

October 12, 2019
Works compound on the south side now cleared out

Works compound on the south side now cleared out

September 21, 2019
Plenty of roof but with a mesh wall on the rebuilt south side platform 1

Plenty of roof but with a mesh wall on the rebuilt south side platform 1

September 21, 2019
PSO pod on the recently rebuilt southern platform at Rockbank

PSO pod on the recently rebuilt southern platform at Rockbank

September 21, 2019
Plenty of roof but with a mesh wall on the rebuilt north side platform 2

Plenty of roof but with a mesh wall on the rebuilt north side platform 2

September 21, 2019
Landscaping in place at the entrance to the new northern car park

Landscaping in place at the entrance to the new northern car park

September 21, 2019
Looking west from Paynes Road at Rockbank towards Cobblebank

Looking west from Paynes Road at Rockbank towards Cobblebank

Second track from Melton yet to be commissioned

July 30, 2019
  • « Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • Next »
  • Home
  • News
  • Updates
  • Line Guides
  • Geelong Region
  • Melbourne Region
  • South West Victoria
  • Locations
  • Stations
  • Industries
  • Signal Boxes
  • Yards
  • Miscellaneous
  • Articles
  • Aerial View
  • Gallery
  • Recent uploads
  • Contact
  • Credits
  • Sources
  • Sitemap
Home :: Sitemap :: Copyright :: Contact
Page Generation: 0.06 seconds.
Copyright 2005 - 2022 © Marcus Wong except where otherwise noted.