Rail Geelong
Rail Geelong - hopefully everything you ever wanted to know about the history of the railways of Geelong and District, and then some.
Home
»
Gallery
»
Recent Uploads
* Check/uncheck all *
Description
File/Folder name
Tags
Title
Recent Uploads
Displaying images 6961 to 7008 of 12117
William Cooper footbridge at Footscray station: Lift down to platform 4
February 15, 2010
William Cooper footbridge at Footscray station: Steps to platform 3 looking west, lifts to platform 2 and 1 behind
February 15, 2010
William Cooper footbridge at Footscray station: Eastern steps up to the footbridge
February 15, 2010
William Cooper footbridge at Footscray station: Signage inside the new footbridge
February 15, 2010
Maryborough: Clocktower and main entry to Maryborough station
February 14, 2010
Maryborough: Maryborough station overview
February 14, 2010
Talbot: Privately leased station building at Talbot
February 14, 2010
Talbot: Talbot station and goods yard looking up the line
February 14, 2010
Talbot: Number 3 road rejoins the mainline at the up end
February 14, 2010
Talbot: Talbot station and goods yard looking down the line
February 14, 2010
Talbot: Ex-Commonwealth Railways carriage EF195 at Talbot
February 14, 2010
Creswick: A new passenger platform will be built in the goods yard for the return of passenger trains to Maryborough
February 14, 2010
Creswick: More relaid track at Creswick
February 14, 2010
Creswick: New concrete sleepers through Creswick station
February 14, 2010
Creswick: Disused signal box and station building
February 14, 2010
Creswick: Disused goods shed
February 14, 2010
Sulky: Midland Highway level crossing
February 14, 2010
Sulky: Indicator for the trailable facing points removed, point blades clipped, and loop road has had short lengths of rail removed
February 14, 2010
Sulky: Sulky Loop being decommissioned - 'part of the plan' for the return of passenger services to Maryborough
February 14, 2010
Laverton Rail Upgrade project: Metro / Metlink signage at the northern entry to the station
February 7, 2010
Laverton Rail Upgrade project: New footbridge open, with high walls around the standard gauge line
February 7, 2010
Laverton Rail Upgrade project: Metlink 'Platform 1'sign on the back of the new platform
February 7, 2010
Laverton Rail Upgrade project: Looking west towards the new footbridge
February 7, 2010
Laverton Rail Upgrade project: A bit more new track laid at Laverton Junction
February 7, 2010
Laverton Rail Upgrade project: Machinery for tracklaying sitting idle at Laverton Junction
February 7, 2010
Laverton Rail Upgrade project: Tracklaying underway but stopped under the Princes Freeway bridge
February 7, 2010
Laverton Rail Upgrade project: Overview of the three platforms from the new footbridge
February 7, 2010
Laverton Rail Upgrade project: Looking north along the new footbridge
February 7, 2010
Laverton Rail Upgrade project: Looking down on the island platform, to be renumbered 2 and 3
February 7, 2010
Laverton Rail Upgrade project: Looking south down the new footbridge
February 7, 2010
Laverton Rail Upgrade project: New footbridge opened, old one still in place but closed off
February 7, 2010
Waurn Ponds cement works: Western face of the cement works
January 23, 2010
Waurn Ponds cement works: Closeup of the new underpass, 8.5 metres clearance
January 23, 2010
Waurn Ponds cement works: New underpass of the railway for quarry trucks
January 23, 2010
Tottenham Triangle: New bridge now in place, all handrails installed
January 16, 2010
William Cooper footbridge at Footscray station: New and old bridges side by side
January 13, 2010
William Cooper footbridge at Footscray station: Northern steps of the footbridge well underway
January 13, 2010
William Cooper footbridge at Footscray station: Northern steps of the footbridge well underway
January 13, 2010
William Cooper footbridge at Footscray station: Lift well to platform 2/3 well underway
January 13, 2010
William Cooper footbridge at Footscray station: Looking east from above platform 2
January 13, 2010
William Cooper footbridge at Footscray station: A second flight of steps alongside platform 3
January 13, 2010
William Cooper footbridge at Footscray station: Steps to platforms 3 and 4 roofed over
January 13, 2010
Talbot: Privately leased station building at Talbot
January 8, 2010
Talbot: Crane on the goods platform at Talbot
January 8, 2010
Talbot: Down end of Talbot Loop, dead end siding headed off to the right
January 8, 2010
Talbot: Station building and platform at Talbot, loop road in the foreground
January 8, 2010
Talbot: Goods platform, shed and loading ramp at Talbot
January 8, 2010
Talbot: Looking up the line at Talbot, dead end siding to the left, mainline and loop to the right
January 8, 2010
« Previous
1
...
144
145
146
147
148
...
253
Next »
Home
News
Updates
Line Guides
Geelong Region
Melbourne Region
South West Victoria
Locations
Stations
Industries
Signal Boxes
Yards
Miscellaneous
Articles
Aerial View
Gallery
Recent uploads
Contact
Credits
Sources
Sitemap