Rail Geelong
Rail Geelong - hopefully everything you ever wanted to know about the history of the railways of Geelong and District, and then some.
Home
»
Gallery
»
Recent Uploads
* Check/uncheck all *
Description
File/Folder name
Tags
Title
Recent Uploads
Displaying images 7009 to 7056 of 11710
Laverton Rail Upgrade project: Digging up the down end of the island platform
September 19, 2009
Laverton Rail Upgrade project: Crane ready to lift the southern footbridge span
September 19, 2009
Laverton Rail Upgrade project: Roof in place, as is some of the floor
September 19, 2009
Laverton Rail Upgrade project: Truss for the southern footbridge span
September 19, 2009
Laverton Rail Upgrade project: Gap in the southern footbridge span for the lift well and stair access
September 19, 2009
Laverton Rail Upgrade project: Base of the footbridge above the island platform
September 19, 2009
Laverton Rail Upgrade project: New up platform, note the face moves outwards towards the tracks about 30 metres in
September 19, 2009
Laverton Rail Upgrade project: Reinforcing bar still sticking up, it appears it will be bent over and concreted in when done
September 19, 2009
Laverton Rail Upgrade project: New up side platform
September 19, 2009
Laverton Rail Upgrade project: Base of the northern stairs
September 19, 2009
Laverton Rail Upgrade project: Northern span of the new footbridge
September 19, 2009
Laverton Rail Upgrade project: North-west view of the lift wells
September 19, 2009
Laverton Rail Upgrade project: New stanchions partly strung with overhead
September 19, 2009
Laverton Rail Upgrade project: New stanchions partly strung with overhead
September 19, 2009
Southern Cross platforms 15/16 to North Melbourne: Pile driver at work on the future platform 15/16
September 17, 2009
Southern Cross platforms 15/16 to North Melbourne: Pile cut off at ground level
September 17, 2009
Southern Cross platforms 15/16 to North Melbourne: Pile driven all the way in
September 17, 2009
Southern Cross platforms 15/16 to North Melbourne: Pile driver at work on the future platform 15/16
September 17, 2009
Southern Cross platforms 15/16 to North Melbourne: Pile driver at work on the future platform 15/16
September 17, 2009
William Cooper footbridge at Footscray station: Plywood covering what appears to be future windows
September 17, 2009
William Cooper footbridge at Footscray station: Cleared site at the west end
September 17, 2009
William Cooper footbridge at Footscray station: New and old footbridges
September 17, 2009
William Cooper footbridge at Footscray station: Two spans up so far
September 17, 2009
William Cooper footbridge at Footscray station: New span in place over the lines to Sunshine
September 17, 2009
William Cooper footbridge at Footscray station: New and old footbridges looking east
September 17, 2009
William Cooper footbridge at Footscray station: Huge collection of bolts joining two sections of the bridge
September 17, 2009
William Cooper footbridge at Footscray station: Opening in the footbridge for platform access
September 17, 2009
William Cooper footbridge at Footscray station: Work continues on the other piers for the bridge
September 17, 2009
William Cooper footbridge at Footscray station: First section of the new footbridge put into place
September 17, 2009
North Melbourne station upgrade: If you were game you could walk out on these angled supports for the roof
September 17, 2009
North Melbourne station upgrade: Steps up from platform 1
September 17, 2009
North Melbourne station upgrade: Esclators down to platform 1
September 17, 2009
North Melbourne station upgrade: New concourse open for interchange, station building still being worked on
September 17, 2009
Corio Quay: 'Locomotive must be on pad for fuelling' - it makes no sense because it is BG, and the Geelong fuel point is nearby. A derail marks the end of the renewed track
September 13, 2009
Corio Quay: Only the siding to the right has been renewed for a short distance
September 13, 2009
Lethbridge: Remains of the cattle yard
September 12, 2009
Meredith: The station as the sun sets
September 12, 2009
Warrenheip: Empty interior of the telephone cabin at the up end of Warrenheip Loop
September 12, 2009
Warrenheip: Point indicators and trailable point machine at the up end
September 12, 2009
Warrenheip: Point indicator and trailable point machine at the up end
September 12, 2009
Warrenheip: Up end of Warrenheip Loop
September 12, 2009
Warrenheip: Looking towards the junction from the up end of Warrenheip Loop
September 12, 2009
Ballarat East: New fuel point and sidings at Ballarat East
September 12, 2009
Ballarat East: Down end of Ballarat East box
September 12, 2009
Ballarat East: Signallers desk and noticeboard
September 12, 2009
Ballarat East: Signallers desk and noticeboard
September 12, 2009
Ballarat East: Twin gatewheels in Ballarat East box
September 12, 2009
Ballarat East: Overview of the lever frame and gatewheels
September 12, 2009
« Previous
1
...
145
146
147
148
149
...
244
Next »
Home
News
Updates
Line Guides
Geelong Region
Melbourne Region
South West Victoria
Locations
Stations
Industries
Signal Boxes
Yards
Miscellaneous
Articles
Aerial View
Gallery
Recent uploads
Contact
Credits
Sources
Sitemap