Displaying images 9313 to 9360 of 11573
North Shore: Rail stress gauge at North ShoreRail stress gauges were installed as a trail on the East line after July 6, 2008. They are located at located at kilometre posts 57.950, 58.900, 65.950 and 67.250. They are intended to assist in determining WOLO (hot weather) speed restrictions, by measuring the rail temperature and sending data to a central point. July 5, 2008 |
V/Line WOLO sensors: Rail stress gauge at North ShoreRail stress gauges were installed as a trial on the East line after July 6, 2008. They are located at located at kilometre posts 57.950, 58.900, 65.950 and 67.250. July 5, 2008 |
|
North Shore: New Viclink signageJuly 5, 2008 |
North Shore: New Viclink signageJuly 5, 2008 |
|
Shell Refinery: Bitumen tanker filling stationPipelines for the diesel and petrol filling station in the foreground July 5, 2008 |
||
Corio: New Viclink signageJuly 5, 2008 |
Corio: New Viclink signageJuly 5, 2008 |
Corio: New Viclink signageJuly 5, 2008 |
Corio Independent Goods Line: Moving old ballastJuly 5, 2008 |
||
North Melbourne station upgrade: Cranes at workJuly 4, 2008 |
||
North Melbourne station upgrade: Placing lift wellsJuly 4, 2008 |
||
North Melbourne station upgrade: Placing lift wellsJuly 4, 2008 |
||
Winchelsea: Dunno what the brick pier is for - part of a former bridge?Barwon River bridge June 19, 2008 |
||
Winchelsea: Barwon River bridgeJune 19, 2008 |
Winchelsea: Barwon River bridgeJune 19, 2008 |
Winchelsea: Driveway and car park for the stationJune 19, 2008 |