Recent Uploads

Displaying images 9313 to 9360 of 11573

North Shore: Rail stress gauge at North Shore

Rail stress gauges were installed as a trail on the East line after July 6, 2008. They are located at located at kilometre posts 57.950, 58.900, 65.950 and 67.250. They are intended to assist in determining WOLO (hot weather) speed restrictions, by measuring the rail temperature and sending data to a central point.

July 5, 2008

V/Line WOLO sensors: Rail stress gauge at North Shore

Rail stress gauges were installed as a trial on the East line after July 6, 2008. They are located at located at kilometre posts 57.950, 58.900, 65.950 and 67.250.

July 5, 2008

Shell Refinery: Bitumen tanker filling station

Pipelines for the diesel and petrol filling station in the foreground

July 5, 2008