Rail Geelong
Rail Geelong - hopefully everything you ever wanted to know about the history of the railways of Geelong and District, and then some.
Home
»
Gallery
»
Recent Uploads
* Check/uncheck all *
Description
File/Folder name
Tags
Title
Recent Uploads
Displaying images 145 to 192 of 10711
Werribee: Myki readers at the top of the pedestrian subway ramp
November 17, 2019
Werribee: Ramp down to the pedestrian subway
November 17, 2019
Werribee: Bird netting beneath the platform canopy
November 17, 2019
Forsyth Road: Second bridge span in place for Forsyth Road
November 17, 2019
Aviation Road level crossing removal project: Road still in place, but with equipment removed and closed to traffic
November 17, 2019
Newport Workshops: Staff only pedestrian crossing across the Werribee line tracks to the workshops
November 17, 2019
West Gate Freeway: Southern side of the West Gate Freeway overpass being expanded
November 17, 2019
West Gate Freeway: Northern side of the West Gate Freeway overpass being expanded
November 17, 2019
Southern Cross platforms 1-8 to Dudley Street: Signal equipment room ZER A starting to tilt, steel reinforced along one side
November 17, 2019
Southern Cross platforms 1-8 to Dudley Street: Signal MYD987 for down trains over the North Melbourne flyover
November 17, 2019
Anderson Road, Albion: Looking north over the broad and standard gauge bridges
November 17, 2019
Sunshine: Crossovers connect the suburban track pair to the Tottenham Yard goods lines
November 17, 2019
Tottenham Station: Guard rails across the Ashley Street bridge
November 17, 2019
Maribyrnong River Viaduct: Hi-rail access point on the Werribee line tracks
November 17, 2019
Maribyrnong River Viaduct: Barbed wire fence between the RRL viaduct and neighbouring warehouse
November 17, 2019
South Kensington: Goods lines peel away from the RRL tracks
November 17, 2019
Southern Cross: Fuel point at Southern Cross platform 2
November 17, 2019
Southern Cross platforms 1-8 to Dudley Street: Fixed red signal SST521 and 'limit of shunt' board at the down end of Southern Cross
November 17, 2019
Southern Cross platforms 1-8 to Dudley Street: Signal SST989 for down trains approaching the flyover
November 17, 2019
Southern Cross platforms 1-8 to Dudley Street: Signals SST986 and SST996 for up trains arriving off the flyover
November 17, 2019
Maribyrnong River Bridge: Lattice steelwork makes up the trusses
November 17, 2019
Maribyrnong River Bridge: Overhead wires connected to the top of the truss
November 17, 2019
Maribyrnong River Viaduct: Werribee line tracks pass beneath the RRL tracks
November 17, 2019
Hopkins Street, Footscray: Signals M212, MW850 and W212 for up trains
November 17, 2019
Hopkins Street, Footscray: Cantilevered overhead gantries for the Sunbury line tracks
November 17, 2019
Hopkins Street, Footscray: Centre pillar of the Hopkins Street bridge
November 17, 2019
Newport: Staff only access step in the platform face at Newport
November 17, 2019
Grade separating Kororoit Creek Road on the Altona line: Road and rail bridges pass over the pipelines to the north of the main bridge
November 17, 2019
Grade separating Kororoit Creek Road on the Altona line: Steel sculptural elements along the side of the bridge
November 17, 2019
Grade separating Kororoit Creek Road on the Altona line: Access pad at the southern end of the bridge
November 17, 2019
Caroline Springs: New up track connected to the existing line at the down end of Caroline Springs platform 1
November 16, 2019
Cobblebank: Applying the finishing touches to the station car park
November 9, 2019
Cobblebank: New station almost ready to be opened
November 9, 2019
Cobblebank: Looking down the line from Ferris Road
November 9, 2019
Cobblebank: Pedestrian gates in place at Ferris Road but no crossing
November 9, 2019
Melton: 'Stop before you cross' signage at Melton
November 9, 2019
Melton: Removing the track at the up end of Melton so the new second track can be tied in
November 9, 2019
Melton: Gantry for up signals MEL712 and MEL710 still in place
November 9, 2019
Melton: Removing the track at the up end of Melton so the new second track can be tied in
November 9, 2019
Melton: Up signals MEL712 and MEL710 dark but still in place
November 9, 2019
Melton: Footpath to nowhere in the northern station car park
November 9, 2019
Melton: Removing the down end crossover, to make way for pointwork leading into replacement down end siding
November 9, 2019
Melton: Removing the down end crossover, to make way for pointwork leading into replacement down end siding
November 9, 2019
Melton: Removing a signal mast at the down end of Melton
It was blocking the alignment of the future second track
November 9, 2019
Melton: Catch point in the future down end siding at Melton
November 9, 2019
Melton: Signal gantry for down trains in place at the down end of the double track at Melton
November 9, 2019
Melton: Removing a signal mast at the down end of Melton
It was blocking the alignment of the future second track
November 9, 2019
Melton: Removing a signal mast at the down end of Melton
It was blocking the alignment of the future second track
November 9, 2019
« Previous
1
2
3
4
5
6
7
...
224
Next »
Home
News
Updates
Line Guides
Geelong Region
Melbourne Region
South West Victoria
Locations
Stations
Industries
Signal Boxes
Yards
Miscellaneous
Articles
Aerial View
Gallery
Recent uploads
Contact
Credits
Sources
Sitemap