Recent Uploads

Displaying images 2209 to 2256 of 11710

Westvic Siding: Looking past the end of the line at Westvic

The tracks across the Rooneys Road level crossing have been removed, track baulks at the down end of the container terminal

May 17, 2017

Camperdown: Never used Myki reader post on the platform at Camperdown

Originally Myki was going to be rolled out to the entire V/Line network, with civil works done at stations. But there was a change of government in 2010 and incoming premier Ted Baillieu decided to cut the scope of the V/Line rollout to just the commuter belt around Melbourne.

May 17, 2017

Camperdown: Never used Myki reader post on the platform at Camperdown

Originally Myki was going to be rolled out to the entire V/Line network, with civil works done at stations. But there was a change of government in 2010 and incoming premier Ted Baillieu decided to cut the scope of the V/Line rollout to just the commuter belt around Melbourne.

May 17, 2017

Warncourt: Princes Highway level crossing still in use for now

To be replaced by twin bridges as part of the Princes Highway duplication project

May 17, 2017

Warncourt: Piling works underway for a pair of new road over rail bridges

Part of the Princes Highway duplication project - two new carriageways to be built on the eastern side of the existing road

May 17, 2017

Warncourt: Piling works underway for a pair of new road over rail bridges

Part of the Princes Highway duplication project - two new carriageways to be built on the eastern side of the existing road

May 17, 2017

Warncourt: Looking south towards the Princes Highway level crossing

Duplication works well underway, with two new carriageways to be built on the eastern side of the existing road

May 17, 2017

Francis Street: 'Start CSR locomotive coasting only' sign for up trains approaching the Francis Street level crossing

Installed by ARTC on 23/12/2015 at only this level crossing - possibly due to the CSR class locomotive traction equipment causing track circuit detection issues?

April 30, 2017

Francis Street: 'End CSR locomotive coasting only' sign for up trains departing the Francis Street level crossing

Installed by ARTC on 23/12/2015 at only this level crossing - possibly due to the CSR class locomotive traction equipment causing track circuit detection issues?

April 30, 2017

Francis Street: 'End CSR locomotive coasting only' sign for down trains departing the Francis Street level crossing

Installed by ARTC on 23/12/2015 at only this level crossing - possibly due to the CSR class locomotive traction equipment causing track circuit detection issues?

April 30, 2017

Caroline Springs: Scratched out pedestrian crossing linking the bus stops to the pedestrian subway

Replaced by a new crossing a short distance away

March 25, 2017