Recent Uploads

Displaying images 241 to 288 of 11710

Geelong Station: Points 151 at the down end of Geelong set for the overrun road

Allowing a down train to arrive into platform 1 while an up train is departing South Geelong

April 1, 2022

Robinsons Road level crossing removal project: Long section of drainage channel along the north side of the railway bridge

Presumably to prevent surface water draining into the deep cutting

April 1, 2022

Footscray: Escalators linking platform 4 and 5 to the overhead bridge are actually running

But nobody uses them because they're in an inconvenient spot

March 13, 2022