|
|
|
|
|
|
|
|
|
|
|
Installed by ARTC on 23/12/2015 at only this level crossing - possibly due to the CSR class locomotive traction equipment causing track circuit detection issues?
January 20, 2019
|
|
Installed by ARTC on 23/12/2015 at only this level crossing - possibly due to the CSR class locomotive traction equipment causing track circuit detection issues?
January 20, 2019
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Note the extra big visor on the signal, to prevent mainline trains from seeing it
January 20, 2019
|
|
|
|
|
|
|