Rail Geelong
Rail Geelong - hopefully everything you ever wanted to know about the history of the railways of Geelong and District, and then some.
Home
»
Gallery
»
Recent Uploads
Recent Uploads
Displaying images 3025 to 3072 of 12968
CRT Siding: Signal 15/26 at Kororoit Creek Road for up trains approaching the siding
January 20, 2019
Kororoit Creek Road: Passing under the road overpass
January 20, 2019
Kororoit Creek Road: Passing under the road overpass
January 20, 2019
Laverton Loop: Signal 15/30 for down trains approaching the loop
January 20, 2019
TDG Siding: Unused turnout still in place and leading nowhere
January 20, 2019
BP Siding: Main line connection now completely removed
January 20, 2019
CRT Siding: Rusty tracks leading into the siding
January 20, 2019
CRT Siding: Signals 15/12 and 15/10 for up trains
January 20, 2019
Vacuum Oil Company siding: Stockpiled rail at the Metro Infrastructure Sidings
January 20, 2019
Vacuum Oil Company siding: No trains stabled in the Metro Infrastructure Sidings
January 20, 2019
Vacuum Oil Company siding: Water tanks stored at the Metro Infrastructure Sidings
January 20, 2019
Grade separating Kororoit Creek Road on the Altona line: Northern approach to the new bridge
January 20, 2019
Grade separating Kororoit Creek Road on the Altona line: Reinforced overhead stanchion at Altona Junction
January 20, 2019
Grade separating Kororoit Creek Road on the Altona line: Stockpiled second hand concrete sleepers at Altona Junction
January 20, 2019
Grade separating Kororoit Creek Road on the Altona line: Stockpiled second hand concrete sleepers at Altona Junction
January 20, 2019
Newport: Track circuits on the standard gauge at Newport South
January 20, 2019
Newport: Metro Trains signal depot at the down end
January 20, 2019
Newport: Staff exchange platforms beside the signal box
January 20, 2019
SCT Laverton: Stockpile of point work and concrete sleeper outside the depot
January 9, 2019
SCT Laverton: Stockpile of point work and concrete sleeper outside the depot
January 9, 2019
SCT Laverton: Stockpile of point work and concrete sleeper outside the depot
January 9, 2019
Aviation Road level crossing removal project: Piling works underway for the road over rail bridge
January 9, 2019
Aviation Road level crossing removal project: Site offices in place
January 9, 2019
Aviation Road level crossing removal project: Piling works underway for the road over rail bridge
January 9, 2019
Aviation Road level crossing removal project: Piling works underway for the road over rail bridge
January 9, 2019
Southern Cross: Fuel point at the southern end of Southern Cross platform 2
January 3, 2019
Sunshine GEB sidings: Southern side of the silos
January 2, 2019
Sunshine GEB sidings: Signal SUN946 for down trains headed towards Brooklyn
January 2, 2019
North Melbourne: Abandoned passageway beneath North Melbourne station
December 28, 2018
North Melbourne: Abandoned passageway beneath North Melbourne station
December 28, 2018
Millbrook Loop: Looking west from Spreadeagle Road towards the new crossing loop
December 11, 2018
Millbrook Loop: Looking east from Spreadeagle Road towards the new crossing loop
December 11, 2018
Millbrook Loop: Looking east from Peerewerrh Road towards the new crossing loop
December 11, 2018
Ballarat Station: Lydiard Street railway gates in operation
December 11, 2018
Ballarat Station: Signage at the Lydiard Street railway gates
December 11, 2018
Ballarat Station: Redevelopment works underway at the Ballarat station goods shed
December 11, 2018
Ballarat Station: Redevelopment works underway at the Ballarat station goods shed
December 11, 2018
Melton: Site offices at the down end of the track duplication at Melton
November 27, 2018
Bacchus Marsh: Site offices in the yard at Bacchus Marsh
November 27, 2018
Bacchus Marsh: Signal equipment room in the yard at Bacchus Marsh
November 27, 2018
Bacchus Marsh: Lift well and footbridge foundations marked out in the yard at Bacchus Marsh
November 27, 2018
Bacchus Marsh: Lift well and footbridge foundations marked out in the yard at Bacchus Marsh
November 27, 2018
Bacchus Marsh: Buffer stops at the down end of Bacchus Marsh
November 27, 2018
Maddingley: Temporary cable ducting between Maddingley and Bacchus Marsh
November 27, 2018
Maddingley: Track lead to the new Maddingley stabling yard still to be completed
November 27, 2018
Maddingley: Equipment storeroom at the new Maddingley stabling yard
November 27, 2018
Maddingley: Overhead lighting at the new Maddingley stabling yard
November 27, 2018
Maddingley: Applying the finishing touches to the new Maddingley stabling yard
November 27, 2018
« Previous
1
...
62
63
64
65
66
...
271
Next »
Home
News
Updates
Line Guides
Geelong Region
Melbourne Region
South West Victoria
Locations
Stations
Industries
Signal Boxes
Yards
Miscellaneous
Articles
Aerial View
Gallery
Recent uploads
Contact
Credits
Sources
Sitemap