|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Only two tracks and two platforms are getting built at present
September 29, 2013
|
Armstrong Road is a new arterial road being built along the east side of the RRL alignment through Wyndham Vale.
September 29, 2013
|
|
Armstrong Road is a new arterial road being built along the east side of the RRL alignment through Wyndham Vale.
September 29, 2013
|
|
|
This span will cross northing - the space is being left for a future pair of tracks
September 29, 2013
|
This span will cross over the RRL track pair
September 29, 2013
|
RRL track pair uses the left bridge, Armstrong Road will use the right bridge
September 29, 2013
|
|
On the western side of the tracks - every bridge along the route also has one
September 29, 2013
|
|
|
New housing to the left, RRL tracks to the right, and the Black Forest Road bridge in the background
September 29, 2013
|
|
|
|
|
|
|
|