Recent Uploads

Displaying images 3793 to 3840 of 12968

Warncourt: Repeating signal G1412 for up trains approaching Warncourt Loop

Located a few KM west of the loop. Also note the 'Start TPWS' and 'End TPWS' signs beside the signal

December 13, 2014

Winchelsea: Additional platform exit leading into the car park

Originally Myki was going to be rolled out to the entire V/Line network, with civil works done at stations. But there was a change of government in 2010 and incoming premier Ted Baillieu decided to cut the scope of the V/Line rollout to just the commuter belt around Melbourne.

December 13, 2014

Winchelsea: Unused myki FPD stand in place beside the booking office

Originally Myki was going to be rolled out to the entire V/Line network, with civil works done at stations. But there was a change of government in 2010 and incoming premier Ted Baillieu decided to cut the scope of the V/Line rollout to just the commuter belt around Melbourne.

December 13, 2014

Waurn Ponds Station: Signal WPD22 for down trains headed towards the cement works and Warrnambool

Located beneath the Anglesea Road bridge, the a LED 'disc' signal directs trains into the holding siding for Waurn Ponds station

October 26, 2014

Waurn Ponds Station: Holding siding for Waurn Ponds station, located west of Anglesea Road

Located away from the residential area due to concerns about rail noise, cement trains are still required to collect the master key to access the Blue Circle Southern siding about a kilometre further down the line.

October 26, 2014

Waurn Ponds Station: Looking west towards the predictor-equipped Ghazeepore Road level crossing

The new Baanip Boulevard bridge is under construction, with the Anglesea Road bridge behind

October 26, 2014