Excavator on the RRL track embankment next to Bulban RoadMarch 16, 2013 |
Excavator beside the Geelong line tracksMarch 6, 2013 |
|
Relocated signal cabling for the broad gauge tracksMarch 6, 2013 |
Temporary cable trunking beside the broad gauge tracksMarch 6, 2013 |
|
Looking south over the straight BG track pair to the slewed SG tracksDecember 30, 2011 |
Completed track slew viewed from the Wests Road level crossingDecember 26, 2011 |
|
Completed track slew looking up the line towards Manor LoopDecember 26, 2011 |
Work on the track slew of the SG at the down end of Manor LoopDecember 24, 2010 |
|
Work on the track slew of the SG at the down end of Manor LoopDecember 24, 2010 |
Excavation mostly complete for the track slewDecember 24, 2010 |
Looking back to the down end of Manor LoopDecember 24, 2010 |
Lineup of excavators parked for the weekendDecember 24, 2010 |
Western end of Manor Road closed for constructionOctober 3, 2010 |
Downer EDI Works is the contractor for works package FOctober 3, 2010 |