Looking beneath the Rising Sun footbridge

Already spanning four tracks, there is room for one or two more tracks to the south end of the span. The northern pylon is already hard up against the freight lines, and the RRL project requires the existing tracks to be slewed a short distance to the north, hence the bridge is being demolished and not replaced.
Looking beneath the Rising Sun footbridge
View full size photo (1024px by 683px)

Taken with a Canon EOS 50D
Date: March 10, 2012 10:14 AM
Exposure Time: 1/200 sec
Aperture Value: f/10
Focal Length: 24 mm