Rail Geelong

Rail Geelong - hopefully everything you ever wanted to know about the history of the railways of Geelong and District, and then some.
Home » Gallery » Western Line » Buangor
fields

Buangor

Rear of the signal bay and station building

Rear of the signal bay and station building

January 8, 2009
Former crossing loop still in place in the foreground, main line behind

Former crossing loop still in place in the foreground, main line behind

January 8, 2009
Platform, signal bay, station building and crossing loop all still in place, the main line is the rear track

Platform, signal bay, station building and crossing loop all still in place, the main line is the rear track

January 8, 2009
Signal bay interior all stripped out

Signal bay interior all stripped out

January 8, 2009
Windows of the signal bay all smashed

Windows of the signal bay all smashed

January 8, 2009
Signal bay interior all stripped out

Signal bay interior all stripped out

January 8, 2009
A big hole where the lever frame used to be

A big hole where the lever frame used to be

January 8, 2009
Platform side of the station building

Platform side of the station building

January 8, 2009
Up end of the crossing loop, main line points removed

Up end of the crossing loop, main line points removed

January 8, 2009
Railway side of the station building

Railway side of the station building

January 8, 2009
Railway side of the station building

Railway side of the station building

January 8, 2009
A rather short passenger platform

A rather short passenger platform

January 8, 2009
Short bit of the crossing loop left behind at the down send

Short bit of the crossing loop left behind at the down send

January 8, 2009
The sleepers for number 3 road recently removed, number 2 road is the current main line

The sleepers for number 3 road recently removed, number 2 road is the current main line

January 8, 2009
Part of the crossing loop removed

Part of the crossing loop removed

January 8, 2009
Down end points for number 3 road removed but the long timber bearers still in place

Down end points for number 3 road removed but the long timber bearers still in place

January 8, 2009
Long timbers for the points into number 3 road still in place in the main line

Long timbers for the points into number 3 road still in place in the main line

January 8, 2009
Drag marks where number 3 road was pulled away from the main line

Drag marks where number 3 road was pulled away from the main line

January 8, 2009
  • « Previous
  • 1
  • 2
  • Next »
  • Home
  • News
  • Updates
  • Line Guides
  • Geelong Region
  • Melbourne Region
  • South West Victoria
  • Locations
  • Stations
  • Industries
  • Signal Boxes
  • Yards
  • Miscellaneous
  • Articles
  • Aerial View
  • Gallery
  • Recent uploads
  • Contact
  • Credits
  • Sources
  • Sitemap
Home :: Sitemap :: Copyright :: Contact
Page Generation: 0.036 seconds.
Copyright 2005 - 2021 © Marcus Wong except where otherwise noted.