Pedestrian underpass beside the Seaby Street level crossingOctober 1, 2019 |
Goods shed now restored for public useOctober 1, 2019 |
Locked up waiting room and a heritage style station signOctober 1, 2019 |
Main Street level crossing looking southJuly 11, 2010 |
Road side of the station building and platformJuly 11, 2010 |
Pedestrian underpass at Main Street looking southJuly 11, 2010 |
Down end points looking up the line back to the stationJuly 11, 2010 |
Switchlock and CTC hut for the down end pointsJuly 11, 2010 |
Switchlock and CTC hut for the down end pointsJuly 11, 2010 |
Looking back to the main line on the flour mill sidingJuly 11, 2010 |
Remaining bits of rail from the flour mill sidingJuly 11, 2010 |
|
Silo in relation to the main lineJuly 11, 2010 |
Ascom silo at the down endJuly 11, 2010 |
Top of the grain elevatorJuly 11, 2010 |