Safeworking diagram - 1970

Displays both the number of tracks and the safeworking system in use for a given year. Pre 1900 details are rather fuzzy. From South Geelong down the line the majority of details are fuzzy as well.

1856 1857 1876 1911 1914 1928 1959 1970 1981 Reset View
3.492 km South Kensington
5.623 km Footscray
7.542 km Yarraville
9.220 km Spotswood
10.555 km Newport
20.917 km Laverton
31.697 km Werribee
47.561 km Little River
57.504 km Lara
63.944 km Corio
North Geelong A
North Geelong B
Geelong A
Geelong B
74.412 km South Geelong
96.700 km Moriac
153.395 km Colac
198.497 km Camperdown
220.785 km Terang
267.301 km Warrnambool
272.002 km Dennington

Legend


Staff and Ticket Automatic & Track Control Double Line Block
Large Electric Staff Centralised Train Control Track Block
Miniature Electric Staff Section Authority Working Yard Limits
Composite Electric Staff Train Order Working Tablet Working
What do they mean?

Sources


  • The majority of opening and safeworking dates are via Andrew Waugh.
  • Additional sources used are listed in the Sources section.