Geelong Plaster Mills Siding
The siding was opened in 1952, with the points facing down trains, secured by a staff lock. On closure the points and staff lock was removed, along with the siding.
The distance from Melbourne was listed as 41 miles 17 chains, which makes no sense as that is back on the main Geelong line.
Events
July 22, 1952 | Opened |
September 2, 1971 | Closed |
Line Opened
September 9, 1918 | Line opened Fyansford Line Junction to Fyansford |
Sources
- Signal Arrangement Diagram - Fyansford RF918 (1985)
- Weekly Notice Extracts - Alan Jungwirth and Keith Lambert