Princes Highway, Warncoort

Level Crossing
Line: Geelong and Warrnambool
Distance from Melbourne: 139.906 km
Track Diagram: View
Google Maps: Satellite /  Map

This is the third crossing of the highway and railway after Geelong, and is the first one without grade separation. It is located at the down end of the former Warncoort station. It is at the 'T' junction of the road from Birregurra, with the junction altered to place it away from the railway crossing. The level crossing is on an acute angle, with the railway from Colac running parallel to the road.

The crossing was the site of the first 'active warning lights' for drivers level crossings, which are a large orange sign with two amber lights embedded in them. When the level crossing is activated the lights alternately illuminate in the same was as those at a zebra crossing. The set of lights fitted here are unique as they are built of standard traffic light components on a single steel post, unlike more recent installations which use a pair of timber posts.

In December 2019 the level crossing was abolished, replaced by a pair of road overpasses at 139.724 km (Outbound) and 139.799km (Inbound) as part of the Princes Highway duplication project between Winchelsea and Colac.

Events


February 15, 1915 Hand gates replaced by cattle pits
June 23, 1960 Flashing lights provided

Top

Photos


Nine of 18 images found displayed. Click them to enlarge.

Princes Highway level crossing still in use for now

To be replaced by twin bridges as part of the Princes Highway duplication project

May 17, 2017

Piling works underway for a pair of new road over rail bridges

Part of the Princes Highway duplication project - two new carriageways to be built on the eastern side of the existing road

May 17, 2017

Piling works underway for a pair of new road over rail bridges

Part of the Princes Highway duplication project - two new carriageways to be built on the eastern side of the existing road

May 17, 2017

Looking south towards the Princes Highway level crossing

Duplication works well underway, with two new carriageways to be built on the eastern side of the existing road