Werribee Street
Level Crossing
Line: Geelong and Warrnambool
Distance from Melbourne: 32.382 km
Track Diagram: View
Google Maps: Satellite / Map
Line: Geelong and Warrnambool
Distance from Melbourne: 32.382 km
Track Diagram: View
Google Maps: Satellite / Map
In 2019 it was announced that the Level Crossing Removal Authority would replace the level crossing with a rail over road bridge structure, that would be around one kilometre long and have a height of about six metres when it crosses Werribee Street.
In 2020 the standard gauge track was temporarily slewed to the north of the existing level crossing, allowing the three single track bridges to be constructed, broad gauge trains being diverted via Tarneit.
Events
October 24, 1976 | Boom barriers provided |
Photos
5 images found. Click them to enlarge.
Werribee Street level crossing from the westAugust 11, 2007 |
Werribee Street level crossing from the eastAugust 11, 2007 |
Wider view of removed stanchions on either sideAugust 11, 2007 |
Werribee Street level crossing from the northAugust 11, 2007 |
Down signals at Werribee StreetJanuary 13, 2007 |
Werribee Street level crossing removal project
Nine of 19 images found displayed. Click them to enlarge.
Completed rail over road bridgeNovember 9, 2021 |
Completed rail over road bridgeNovember 9, 2021 |
|
Temporary level crossing on the slewed standard gauge gaugeNovember 7, 2020 |
Crane lifting scaffolding to the top of the bridge deckNovember 7, 2020 |