Search results
You are currently searching the Gallery: you can also search this site via Google.
57 total matches for October 27, 2012
Spion Kop Junction: New bridge over Lloyd StreetThe existing low level bridge for the four suburban tracks is in the foreground. The new high level three track bridge for RRL (and a goods line) is in the background. October 27, 2012 |
Spion Kop Junction: North-eastern side of the abutment of the new RRL Lloyd Street bridgeNote the gap between the old abutments, and the new bridge October 27, 2012 |
|
Spion Kop Junction: North-western side of the abutment of the new RRL Lloyd Street bridgeThe corner has been rebuilt with recycled bricks October 27, 2012 |
||
Spion Kop Junction: Rebuilt bridge for RRL over Lloyd StreetOctober 27, 2012 |
||
Spion Kop Junction: Rebuilt bridge for RRL over Lloyd StreetOctober 27, 2012 |
Spion Kop Junction: Retaining wall back towards South KensingtonOctober 27, 2012 |
|
South Kensington: Temporary fencing beside the goods line track pairThe RRL track pair will pass through here, leaving a single tracks for freight October 27, 2012 |
||
Spion Kop Junction: Tiebacks in the Lloyd Street retaining wallSoil nailing or something similar is being used to tie the bricks back into the embankment October 27, 2012 |
South Kensington: Work on the embankment near Kensington RoadThe RRL track pair will be built in the foreground, at the same level as the existing four tracks October 27, 2012 |
- « Previous
- 1
- 2
- 3
- 4
- Next »