Burrumbeet: Automatic pedestrian gates at the reopened Avenue Road level crossing at Burrumbeet

The level crossing was closed back in the 1990s with the opening of the Ballarat Bypass, then reopened in 2015 to allow the Avenue of Honour to continue north as a continuous road.

July 23, 2016

Burrumbeet: Looking east at the reopened Avenue Road level crossing at Burrumbeet

The level crossing was closed back in the 1990s with the opening of the Ballarat Bypass, then reopened in 2015 to allow the Avenue of Honour to continue north as a continuous road.

July 23, 2016

Burrumbeet: Looking north at the reopened Avenue Road level crossing at Burrumbeet

The level crossing was closed back in the 1990s with the opening of the Ballarat Bypass, then reopened in 2015 to allow the Avenue of Honour to continue north as a continuous road.

July 23, 2016

Burrumbeet: Looking south at the reopened Avenue Road level crossing at Burrumbeet

The level crossing was closed back in the 1990s with the opening of the Ballarat Bypass, then reopened in 2015 to allow the Avenue of Honour to continue north as a continuous road.