Search results

You are currently searching the Gallery: you can also search this site via Google.

5 total matches for November 26, 2016

Caroline Springs: Left hand turnout awaiting installation at the up end of Caroline Springs station

Presumably it will form a crossover from the down to up track for trains exiting the Boral quarry siding, in conjunction with the existing left hand turnout at the end of the single track.

November 26, 2016

Caroline Springs: Left hand turnout awaiting installation at the up end of Caroline Springs station

Presumably it will form a crossover from the down to up track for trains exiting the Boral quarry siding, in conjunction with the existing left hand turnout at the end of the single track.

November 26, 2016