Search results

You are currently searching the Gallery: you can also search this site via Google.

14 total matches for "October 11" OR "2008" - 7 albums and 7 images.

North Shore: Rail stress gauge at North Shore

Rail stress gauges were installed as a trail on the East line after July 6, 2008. They are located at located at kilometre posts 57.950, 58.900, 65.950 and 67.250. They are intended to assist in determining WOLO (hot weather) speed restrictions, by measuring the rail temperature and sending data to a central point.

July 5, 2008

North Shore: Rail stress gauge at North Shore

Rail stress gauges were installed as a trail on the East line after July 6, 2008. They are located at located at kilometre posts 57.950, 58.900, 65.950 and 67.250. They are intended to assist in determining WOLO (hot weather) speed restrictions, by measuring the rail temperature and sending data to a central point.

July 5, 2008

V/Line WOLO sensors: Rail stress gauge at North Shore

Rail stress gauges were installed as a trial on the East line after July 6, 2008. They are located at located at kilometre posts 57.950, 58.900, 65.950 and 67.250.

July 5, 2008

V/Line WOLO sensors: Rail stress gauge at North Shore

Rail stress gauges were installed as a trial on the East line after July 6, 2008. They are located at located at kilometre posts 57.950, 58.900, 65.950 and 67.250.

July 5, 2008

Geelong Locomotive Depot: Railcar fuel point completed

But still not in use by May 2008...

December 19, 2007