Search results

You are currently searching the Gallery: you can also search this site via Google.

3 total matches for "March 30" OR "2018" - 2 albums and 1 images.

Boral North Shore

Boral North Shore

In 2018 work started on a clinker grinding and cement facility at the Port of Geelong, with imported clinker being unloaded at Lascelles Wharf and moved by conveyor for processing. Containerised cement will then be transported by Qube Logistics from a rail loading facility at North Shore to the existing Dandenong South cement siding.

Grade separating Kororoit Creek Road on the Altona line

Grade separating Kororoit Creek Road on the Altona line

In 2018 the level crossing on Kororoit Creek Road on the Altona line was grade separated, with the railway being moved onto a double track rail over road bridge